The Oval
Employer: | Cybarco – Lanitis Group |
---|---|
Architect: | ATKINS UK – Armeftis CY |
Area: | Limassol, Cyprus |
Type: | Offices |
Designed: | 2012-2013 |
Constructed: | Under construction |
Scope of Work:
- Complete design of Mechanical installations.
- Mechanical installations.
- Design of Sea water de-centralized geo-exchange system.
- Separate water source heat pump for each office on a common geo-exchange piping network.
Technical Data:
- Cooling capacity → 1.100kW
- Heating capacity →700kW
- Total built-up area → 16.850m²
- 82m maximum elevation variation for building services (20 storevs equivalent)