REHABILITATION OF EXISTING ICCP SYSTEM

Employer: MOTOR OIL HELLAS
End User: CORAL GAS
Area: Alexandroupoli, Greece
Type: Onshore Pipeline
Designed: N/A
Constructed: 2019

Scope of Work:

Material supply & Commissioning.

We supplied and commissioning the new ground bed with SiFeCr anode on an existing ICCP system.

Soil resistivity survey performed to locate the proper position of our anode ground bed.

  • SiFeCr anode
  • Reference electrode

Technical Data:

  • 1.2km offshore and onshore import pipeline

Επικοινωνήστε μαζί μας

    Name (required)

    Email (required)

    Subject that you are interested in

    Message

    [recaptcha]

    Log in with your credentials

    Forgot your details?